Cómo usar
- Copia el comando y revisa el paquete antes de instalarlo en tu entorno de agente.
- Consulta las herramientas, credenciales y entornos necesarios en el documento original.
- Describe las entradas y el resultado deseado; contrasta la salida con las fuentes.
npx skills add https://github.com/google-deepmind/robotics-antigravity-plugin --skill iterationAntes de empezar
- La instalación no incluye suscripción al modelo, cuota API ni permisos sobre tus archivos.
- Las estrellas e instalaciones reflejan actividad, no una prueba independiente de calidad o seguridad.
Contenido del repositorio de origen con títulos, ejemplos, código, tablas, enlaces e imágenes preservados.
Iterating on robot code
Work in stages
- Split a long task into stages, one per sub-goal. For example, putting five
objects in a box is five stages. An action that already works reliably, such as a closed-loop pick-and-place, counts as one stage.
- Write each stage as one script that observes, plans, acts, measures the
result, and prints it. Run it with a timeout, for example timeout 300 python3 stage_1.py.
- After each stage, use the measured result to decide whether to move on. If
the stage failed, look at the trajectory to find where it went wrong and fix the code. Then measure the scene again and go back to the first stage whose goal no longer holds.
- Do not put multi-line code in
python3 -c. Write it to a file instead.
Get a second opinion when stuck
Use this when you can record video and start subagents.
- When a stage fails repeatedly, give a separate subagent the video of the
last try (a video, not still images) and ask it to describe what happened and what went wrong. Send only the video, not your code or what you expected, so that its description is not biased.
- If the stage still fails after that, give a separate subagent the videos,
your code, and the measured results, and ask what to change.
Done means measured
- Decide success from measurements taken after the robot has let go and the
scene has settled, not from commanded poses or a printed "SUCCESS". Check every goal condition before you finish.