Mode d’emploi
- Copiez la commande et examinez le paquet avant de l’installer dans votre environnement agent.
- Consultez le document original pour les outils, identifiants et environnements requis.
- Décrivez les entrées et le livrable souhaité ; comparez la sortie aux sources.
npx skills add https://github.com/donchitos/claude-code-game-studios --skill sprint-statusAvant de commencer
- L’installation n’inclut ni abonnement au modèle, ni quota API, ni accès aux fichiers.
- Étoiles et installations reflètent l’activité, pas un test indépendant de qualité ou de sécurité.
Rendu depuis le dépôt source en conservant titres, exemples, code, tableaux, liens et images.
!bash "${CLAUDE_SKILL_DIR}/../../hooks/yaml-helper.sh" resolve_config --keys story_granularity,workflow
Sprint Status
This is a fast situational awareness check, not a sprint review. It reads the current sprint plan and story files, scans for status markers, and produces a concise snapshot in under 30 lines. For detailed sprint management, use /sprint-plan update or /milestone-review.
This skill is read-only. It never proposes changes, never asks to write files, and makes at most one concrete recommendation.
`story_granularity` — it sets the grain of the burn-down read: feature-sized chunks at coarse (the default, via rigor: minimal), task-sized at balanced (rigor: standard), AC-sized at fine.
1. Find the Sprint
Argument: $ARGUMENTS (blank = use current sprint)
- If an argument is given (e.g.,
/sprint-status 3), search
production/sprints/ for a file matching sprint-003.md, sprint-03.md, sprint-3.md, or similar (/sprint-plan writes three digits). Report which file was found.
- If no argument is given, find the most recently modified file in
production/sprints/ and treat it as the current sprint.
- If
production/sprints/does not exist or is empty: - At `workflow: minimal` there are no sprints by design — the brief's
build order is the plan and the story files carry it. Report progress through it instead, then stop:
- The list below was printed by
.claude/scripts/story-status.sh
before you read this skill: one line per unfinished story, already in the route's order (IN_REVIEW, IN_PROGRESS, then TODO — a Ready or Not Started story — in build order), then BLOCKED, OTHER, NO_STATUS and the COMPLETE count:
!bash "${CLAUDE_SKILL_DIR}/../../scripts/story-status.sh"
- Print, in under 15 lines:
Build order: [N] of [M] stories complete
from the COMPLETE line (count only Complete and Done stories — In Review is not complete), then Next: the story on the first IN_REVIEW, IN_PROGRESS or TODO line. The list is already current; do not run the script again, and do not re-rank the story files — an In Review story is closed before an In Progress one continues: its work is written. Recommend /story-done [path] for IN_REVIEW, /dev-story [path] for IN_PROGRESS or TODO. Name any BLOCKED story with its blocker; it is never Next.
- Every story
Complete(orDone) → "Build order done: [M] of [M]
stories complete." Offer three ways on: play the build; add the next stories from the brief with /create-stories; or /settings to raise modes.rigor if the game has outgrown a one-page brief.
STORIES none— no story files at all → "No stories yet. Run
/create-stories to turn the brief's build order into stories."
- No
IN_REVIEW,IN_PROGRESSorTODOline, yet theCOMPLETEline
is short of the total — every unfinished story is BLOCKED, OTHER (such as Draft) or NO_STATUS. There is no Next, and the build order is not done: never say it is. Print the Build order line, then name each BLOCKED story with its blocker — read from its story file, usually a BLOCKED: note — and each other story with its status as written. Recommend one step: what the first blocker needs, or else finishing the first Draft or unstatused story and setting its Status to Ready.
- At `standard` or `full`, report: "No sprint files found. Start a sprint
with /sprint-plan new." Then stop.
Read the sprint file in full. Extract:
- Sprint number and goal
- Start date and end date
- All story or task entries with their priority (Must Have / Should Have /
Nice to Have), owner, and estimate
2. Calculate Days Remaining
Using today's date and the sprint end date from the sprint file, calculate:
- Total sprint days (end minus start)
- Days elapsed
- Days remaining
- Percentage of time consumed
If the sprint file does not include explicit dates, note "Sprint dates not found — burndown assessment skipped."
3. Scan Story Status
First: check for `production/sprint-status.yaml`.
If it exists, read it directly — it is the authoritative source of truth. Extract each story's status, and its priority, owner and blocker when set — they fill the status table's columns. No markdown scanning needed. Use its sprint, goal, start, end fields instead of re-parsing the sprint plan.
If `sprint-status.yaml` does not exist (legacy sprint or first-time setup), fall back to markdown scanning:
- If the entry references a story file path, check if the file exists.
Read the file and scan for status markers: DONE, COMPLETE, IN PROGRESS, BLOCKED, NOT STARTED (case-insensitive).
- If the entry has no file path (inline task in the sprint plan), scan the
sprint plan itself for status markers next to that entry.
- If no status marker is found, classify as NOT STARTED.
- If a file is referenced but does not exist, classify as MISSING and note it.
When using the fallback, add a note at the bottom of the output: "⚠ No sprint-status.yaml found — status inferred from markdown. Run /sprint-plan update to generate one."
Optionally (fast check only — do not do a deep scan): grep the code root for a directory or file name that matches the story's system slug to check for implementation evidence. This is a hint only, not a definitive status.
Stale Story Detection
After collecting status for all stories, check each IN PROGRESS story for staleness:
- Resolve the dates with one grep across the story set, not a read per story
— a date is a single line, and opening every in-progress story to find it is the whole cost of this check:
Grep pattern="\*{0,2}(Last Updated|Updated|last-updated|updated_at)\*{0,2}[[:space:]]*:" glob="production/epics/**/story-*.md" output_mode="content"That one pattern accepts every field-name variant. A story with no match has no date, which is not the same as being stale — report it as "never stamped" and do not compute an age for it.
The `\{0,2}wrappers are why this works at all.**/create-storiesemits> Last Updated: …, so a pattern requiring:immediately after the word matched no story ever written. Combined with the "no match = never stamped" rule directly above — which is correct in itself — the failure was completely silent: every in-progress story reported as never stamped, and stale-story detection never once fired. A bareUpdated:` anchor will regress it.
- Calculate days since that date using today's date.
- If the date is more than 4 days ago, flag the story as STALE. (4-day threshold accounts for weekends — a story last touched on Friday won't appear stale until Wednesday.)
- If no date field is found in the story file, note "no timestamp — cannot check staleness."
- If the story has no referenced file (inline task), note "inline task — cannot check staleness."
STALE stories are included in the output table and collected into an "Attention Needed" section (see Phase 5 output format).
Stale story escalation: If any IN PROGRESS story is flagged STALE (no progress in 4+ days), the burndown verdict is upgraded to at least At Risk — even if the completion percentage is within the normal On Track window. Record this escalation reason: "At Risk — [S] stale story(ies): [title] ([D] days)[, …]" — [S] is how many stories are STALE, and each is named with its own [D], the days since its own Last Updated date (not the oldest age, not an average).
4. Burndown Assessment
Calculate:
- Tasks complete (DONE or COMPLETE)
- Tasks in progress (IN PROGRESS)
- Tasks blocked (BLOCKED)
- Tasks not started (NOT STARTED or MISSING)
- Completion percentage: (complete / total) * 100
Assess burndown by comparing completion percentage to time consumed percentage:
- On Track: completion % is within 10 points of time consumed % or ahead
- At Risk: completion % is 10-25 points behind time consumed %
- Behind: completion % is more than 25 points behind time consumed %
If dates are unavailable, skip the burndown assessment and report "On Track / At Risk / Behind: unknown — sprint dates not found."
5. Output
Keep the output concise. The story status table is mandatory — do not truncate it. Aim for under 50 lines total; omit the Emerging Risks section if nothing notable was found. Use this format:
## Sprint [N] Status — [Today's Date]
**Sprint Goal**: [from sprint plan]
**Days Remaining**: [N] of [total] ([% time consumed])
### Progress: [complete/total] tasks ([%])
| Story / Task | Priority | Status | Owner | Blocker |
|----------------------|------------|-------------|---------|----------------|
| [title] | Must Have | DONE | [owner] | |
| [title] | Must Have | IN PROGRESS | [owner] | |
| [title] | Must Have | BLOCKED | [owner] | [brief reason] |
| [title] | Should Have| NOT STARTED | [owner] | |
### Attention Needed
| Story / Task | Status | Last Updated | Days Stale | Note |
|----------------------|-------------|----------------|------------|----------------|
| [title] | IN PROGRESS | [date or N/A] | [N days] | [STALE / no timestamp — cannot check staleness / inline task — cannot check staleness] |
*(Omit this section entirely if no IN PROGRESS stories are stale or have timestamp concerns.)*
### Burndown: [On Track / At Risk / Behind]
[1-2 sentences. If behind: which Must Haves are at risk. If on track: confirm
and note any Should Haves the team could pull.]
### Must-Haves at Risk
[List any Must Have stories that are BLOCKED or NOT STARTED with less than
40% of sprint time remaining. If none, write "None."]
### Emerging Risks
[Any risks visible from the story scan: missing files, cascading blockers,
stories with no owner. If none, write "None identified."]
### Recommendation
[One concrete action, or "Sprint is on track — no action needed."]6. Fast Escalation Rules
Apply these rules before outputting, and place the flag at the TOP of the output if triggered (above the status table):
Critical flag — if Must Have stories are BLOCKED or NOT STARTED and less than 40% of the sprint time remains:
SPRINT AT RISK: [N] Must Have stories are not complete with [X]% of sprint
time remaining. Recommend replanning with `/sprint-plan update`.Completion flag — if all Must Have stories are DONE:
All Must Haves complete. Team can pull from Should Have backlog.Missing stories flag — if any referenced story files do not exist:
NOTE: [N] story files referenced in the sprint plan are missing.
Run `/story-readiness sprint` to validate story file coverage.Collaborative Protocol
This skill is read-only. It reports observed facts from files on disk.
- It does not update the sprint plan
- It does not change story status
- It does not propose scope cuts (that is
/sprint-plan update) - It makes at most one recommendation per run
For more detail on a specific story, the user can read the story file directly or run /story-readiness [path].
For sprint replanning, use /sprint-plan update. For end-of-sprint retrospective, use /retrospective.