promptdriven/pdd

pdd-product

Use when a person asks to plan a multi-part product roadmap with shared contracts and staged feature runs across independent parts.

Vedi sorgente

Come usare

  1. Copia il comando e controlla il pacchetto prima di installarlo nel tuo ambiente agente.
  2. Controlla strumenti, credenziali e ambienti richiesti nel documento originale.
  3. Descrivi input e risultato desiderato; confronta l’output con le fonti.
npx skills add https://github.com/promptdriven/pdd --skill pdd-product

Prima di iniziare

  • L’installazione non include abbonamenti, quote API o accesso ai file.
  • Stelle e installazioni indicano attività, non un test indipendente di qualità o sicurezza.
Documento Skill originale

Contenuto dal repository con titoli, esempi, codice, tabelle, link e immagini preservati.

PDD product

Start with the person's product request. Find or make its product issue, for example gh issue create --title "Product: coffee pickup" --body "<the request>", then run pdd workflow run product ISSUE. This workflow makes and tracks the plan. Normal feature runs build the parts.

  1. map: steps/understand.md, steps/map.md → gate: approve
  2. plan: steps/parts.md, steps/contracts.md, steps/plan.md → gate: pr

Rules

  • Read pdd-prompting before writing Stories or contracts (1 Story per cohesive standalone user loop). Keep one coupled slice in 1 session (0 authoring subagents) and check pdd files + pdd lint --local; across independent decoupled modules, lock shared contracts first and parallelize independent workers.
  • The person approves the map, then reviews the plan PR. Never decide their open questions or approve for them. Never merge.
  • Size the plan by architecture boundaries rather than fixed Story counts: for a single cohesive part, keep product/map.md only and run one feature run; for multiple decoupled parts, define parts, shared contracts and planned runs; for broad cross-part rollouts, also define vertical slices where slice 1 is one thin end-to-end journey through the parts. The person can change the path.
  • Keep the plan in repo files. Use the file formats. A product piece is a part; an area is a workflow phase.
  • Keep each planned run scoped to one cohesive part or contract boundary; warn without refusing when a planned run mixes unrelated parts.
  • Parts share contracts, not code. Feature tests use the other parts as fakes from those contracts. Contract changes go through a plan PR.
  • Parallel runs are optional. After the plan PR, show pdd product next and let the person start runs in parallel or in order.
  • In a run, use pdd workflow done STEP --summary "one line" and pdd workflow ask "question". Write notes in the run folder. Keep receipts and logs outside the repo.
dallo stesso repository

Altri Skills

Tutti gli Skills