Cómo usar
- Copia el comando y revisa el paquete antes de instalarlo en tu entorno de agente.
- Consulta las herramientas, credenciales y entornos necesarios en el documento original.
- Describe las entradas y el resultado deseado; contrasta la salida con las fuentes.
npx skills add https://github.com/ssiertsema/claude-code-plugins --skill business-process-modelingAntes de empezar
- La instalación no incluye suscripción al modelo, cuota API ni permisos sobre tus archivos.
- Las estrellas e instalaciones reflejan actividad, no una prueba independiente de calidad o seguridad.
Contenido del repositorio de origen con títulos, ejemplos, código, tablas, enlaces e imágenes preservados.
Business Process Modeling (BPMN)
You model a business process using BPMN 2.0 conventions. Produce a structured spec + Mermaid flowchart approximating BPMN notation, plus optional BPMN XML for dedicated tooling (Camunda, bpmn.io, Signavio).
Core rules
- BPMN-compliant vocabulary: events, activities, gateways, flows — use the standard element types
- Swim lanes for actor separation: one lane per actor / role / system
- Gateway semantics explicit: exclusive (XOR) vs parallel (AND) vs inclusive (OR) — state which
- Flows typed: sequence (solid) vs message (dashed, across pool boundaries) vs association (dotted, to artifacts)
- No fabricated process steps: work from supplied process description or interview
- As-is vs to-be distinct: never blend current-state with proposed-state
Input handling
| Dimension | Required | Default |
|---|---|---|
| Process name | Yes | — |
| Mode (as-is / to-be / gap) | Yes | — |
| Actors / roles / systems | Yes | — |
| Process steps | No | Elicit |
| Start + end events | No | Elicit |
Phase 1 — Setup
**Process**: [name]
**Mode**: [as-is / to-be / gap (as-is + to-be comparison)]
**Actors**: [list with roles / systems]
**Scope**: [where the process starts and ends]
**Exceptions in scope**: [happy path only / + key exceptions / comprehensive]Ask render mode per diagram-rendering mixin and output path (default: /documentation/[case]/business-process-modeling/).
Phase 2 — BPMN element vocabulary
Events (circles)
| Element | Symbol | Use |
|---|---|---|
| Start | Thin circle | Process begins |
| Intermediate | Double circle | Event during process (time, message, signal, error) |
| End | Thick circle | Process terminates |
Event subtypes: message, timer, signal, error, escalation, cancel, compensation, conditional, link.
Activities (rounded rectangles)
| Element | Use |
|---|---|
| Task | Atomic work step |
| Subprocess | Collapsed group of steps (+ marker inside) |
| Call activity | References reusable global process |
| Service task | Automated system call |
| User task | Human task with UI |
| Manual task | Human task outside any system |
| Send / receive task | Explicitly message-driven |
Gateways (diamonds)
| Element | Semantics |
|---|---|
| Exclusive (X) | Exactly one path taken; condition-based |
| Parallel (+) | All paths taken simultaneously; merge waits for all |
| Inclusive (O) | One or more paths taken based on condition |
| Event-based | Branch selected by whichever event fires first |
Flows
| Flow | Line | Use |
|---|---|---|
| Sequence | Solid arrow | Order within same pool |
| Message | Dashed arrow | Between pools |
| Association | Dotted line | To data object or annotation |
Pools & lanes
- Pool: external participant (customer, partner, vendor) or major system
- Lane: internal role within a pool (approver, analyst, automated system)
Artifacts
- Data object — data needed / produced by activity
- Data store — persistent storage
- Annotation — explanatory text
Phase 3 — Per-activity spec
For each activity, capture:
| Field | Description |
|---|---|
| ID | A-01, ... |
| Lane | Actor / role |
| Type | task / subprocess / service / user / manual / send / receive |
| Description | Verb-object ("Validate application", "Send confirmation email") |
| Inputs | Data consumed |
| Outputs | Data produced |
| SLA / duration (optional) | Expected time |
| Exceptions | Known failure modes |
Phase 4 — Per-gateway spec
For each decision point:
| Field | Description |
|---|---|
| ID | G-01, ... |
| Type | exclusive / parallel / inclusive / event-based |
| Condition | Formal rule(s) driving selection |
| Branches | Outgoing flows with labels |
| Data source | Where the decision value comes from |
Phase 5 — Exception handling
Per exception path:
| Exception | Trigger | Handler | Compensation |
|---|---|---|---|
| Application invalid | Validation fails | Return-to-applicant path | Notify applicant |
| System timeout | 30s elapsed | Escalate to manager | Log + retry policy |
Exceptions typically become alternative branches or error-boundary events on activities.
Phase 6 — Gap analysis (gap mode only)
If mode = gap, compare as-is to to-be:
| Aspect | As-is | To-be | Delta |
|---|---|---|---|
| Handoffs | 7 | 3 | −4 (automation) |
| Manual touches | 12 | 5 | −7 |
| Average cycle time | 5 days | 1 day | −4 days |
| Error-recovery paths | 2 | 5 | +3 |
Per changed activity: category (removed / added / modified / automated / merged / split).
Phase 7 — Mermaid rendering
BPMN isn't natively Mermaid — use flowchart with swimlanes via subgraphs:
flowchart LR
subgraph Customer
Start(("Start"))
Submit["Submit application"]
end
subgraph Agent
Review["Review app"]
Approve["Approve"]
Reject["Reject"]
end
subgraph System
Validate{"Valid?"}
Notify["Send result"]
end
End(("End"))
Start --> Submit --> Review --> Validate
Validate -- "Yes" --> Approve --> Notify --> End
Validate -- "No" --> Reject --> NotifyFor fuller BPMN fidelity, emit BPMN 2.0 XML (optional output) that can be imported into Camunda Modeler / bpmn.io.
Phase 8 — Optional BPMN XML emission
If user requests, produce .bpmn file with proper XML. Structure:
<?xml version="1.0" encoding="UTF-8"?>
<bpmn:definitions xmlns:bpmn="http://www.omg.org/spec/BPMN/20100524/MODEL" ...>
<bpmn:process id="Process_1" isExecutable="false">
<bpmn:startEvent id="StartEvent_1" name="Start" />
<bpmn:task id="Task_1" name="Submit application" />
<bpmn:sequenceFlow id="Flow_1" sourceRef="StartEvent_1" targetRef="Task_1" />
<!-- ... -->
</bpmn:process>
</bpmn:definitions>Note: skill emits XML structure; positional / diagram info (BPMNDI) minimal — dedicated tools re-layout on import.
Phase 9 — Diagram rendering
Per diagram-rendering mixin. File names:
process-[mode].mmd/.pngprocess-[mode].bpmn(XML, optional)gap-analysis.mmd/.png(if gap mode)
Phase 10 — Report assembly and approval
# Business Process Model: [Process]
**Date**: [date]
**Mode**: [as-is / to-be / gap]
**Actors**: [list]
**Scope**: [start → end]
## Scope
[Process, mode, actors, scope, exceptions]
## Actors / Pools / Lanes
[Pool + lane diagram + actor descriptions]
## Activities
[Table: ID, lane, type, description, inputs, outputs, SLA, exceptions]
## Gateways
[Table: ID, type, condition, branches, data source]
## Flows
[Summary: sequence + message + association counts; notable message flows across pools]
## Exception Handling
[Per exception: trigger, handler, compensation]
## Diagram
[Mermaid flowchart approximating BPMN]
## Gap Analysis (gap mode only)
[Delta per aspect + per-activity category]
## BPMN XML (if requested)
[Link to .bpmn file]
## Assumptions & Limitations
[Process coverage gaps, Mermaid-vs-BPMN fidelity notes]Present for user approval. Save only after confirmation.
Generation + extraction rules
- BPMN element vocabulary used strictly
- Gateway semantics explicit
- As-is / to-be never mixed
- No fabricated activities or actors
- Happy path and exceptions separate (marked)
Failure behavior
| Situation | Behavior |
|---|---|
| No process | Interview mode (§7) |
| No actors | Ask; 1 actor = suspicious, 10+ = probably too granular |
| Gateway condition unclear | Require explicit condition before diagramming |
| As-is mixed with to-be wishes | Split into two modes |
| Happy path only but user wants exceptions | Expand scope OR produce happy-path now + exception pass next |
| mmdc failure | See diagram-rendering mixin |
| Out-of-scope ("automate the process") | "Modeling only; automation is engineering." |
Self-check
[] Process name + mode declared
[] Actors / lanes / pools specified
[] Scope (start → end) explicit
[] BPMN vocabulary used strictly
[] Activities have type, I/O, lane
[] Gateways have type + condition + branches
[] Exception handling covered (or happy-path scope declared)
[] Flows typed (sequence / message / association)
[] Gap analysis if gap mode
[] Mermaid diagram valid
[] BPMN XML emitted if requested
[] As-is and to-be not mixed
[] No fabricated activities
[] Report follows output contract

