Mode d’emploi
- Copiez la commande et examinez le paquet avant de l’installer dans votre environnement agent.
- Consultez le document original pour les outils, identifiants et environnements requis.
- Décrivez les entrées et le livrable souhaité ; comparez la sortie aux sources.
npx skills add https://github.com/ssiertsema/claude-code-plugins --skill business-process-modelingAvant de commencer
- L’installation n’inclut ni abonnement au modèle, ni quota API, ni accès aux fichiers.
- Étoiles et installations reflètent l’activité, pas un test indépendant de qualité ou de sécurité.
Rendu depuis le dépôt source en conservant titres, exemples, code, tableaux, liens et images.
Business Process Modeling (BPMN)
You model a business process using BPMN 2.0 conventions. Produce a structured spec + Mermaid flowchart approximating BPMN notation, plus optional BPMN XML for dedicated tooling (Camunda, bpmn.io, Signavio).
Core rules
- BPMN-compliant vocabulary: events, activities, gateways, flows — use the standard element types
- Swim lanes for actor separation: one lane per actor / role / system
- Gateway semantics explicit: exclusive (XOR) vs parallel (AND) vs inclusive (OR) — state which
- Flows typed: sequence (solid) vs message (dashed, across pool boundaries) vs association (dotted, to artifacts)
- No fabricated process steps: work from supplied process description or interview
- As-is vs to-be distinct: never blend current-state with proposed-state
Input handling
| Dimension | Required | Default |
|---|---|---|
| Process name | Yes | — |
| Mode (as-is / to-be / gap) | Yes | — |
| Actors / roles / systems | Yes | — |
| Process steps | No | Elicit |
| Start + end events | No | Elicit |
Phase 1 — Setup
**Process**: [name]
**Mode**: [as-is / to-be / gap (as-is + to-be comparison)]
**Actors**: [list with roles / systems]
**Scope**: [where the process starts and ends]
**Exceptions in scope**: [happy path only / + key exceptions / comprehensive]Ask render mode per diagram-rendering mixin and output path (default: /documentation/[case]/business-process-modeling/).
Phase 2 — BPMN element vocabulary
Events (circles)
| Element | Symbol | Use |
|---|---|---|
| Start | Thin circle | Process begins |
| Intermediate | Double circle | Event during process (time, message, signal, error) |
| End | Thick circle | Process terminates |
Event subtypes: message, timer, signal, error, escalation, cancel, compensation, conditional, link.
Activities (rounded rectangles)
| Element | Use |
|---|---|
| Task | Atomic work step |
| Subprocess | Collapsed group of steps (+ marker inside) |
| Call activity | References reusable global process |
| Service task | Automated system call |
| User task | Human task with UI |
| Manual task | Human task outside any system |
| Send / receive task | Explicitly message-driven |
Gateways (diamonds)
| Element | Semantics |
|---|---|
| Exclusive (X) | Exactly one path taken; condition-based |
| Parallel (+) | All paths taken simultaneously; merge waits for all |
| Inclusive (O) | One or more paths taken based on condition |
| Event-based | Branch selected by whichever event fires first |
Flows
| Flow | Line | Use |
|---|---|---|
| Sequence | Solid arrow | Order within same pool |
| Message | Dashed arrow | Between pools |
| Association | Dotted line | To data object or annotation |
Pools & lanes
- Pool: external participant (customer, partner, vendor) or major system
- Lane: internal role within a pool (approver, analyst, automated system)
Artifacts
- Data object — data needed / produced by activity
- Data store — persistent storage
- Annotation — explanatory text
Phase 3 — Per-activity spec
For each activity, capture:
| Field | Description |
|---|---|
| ID | A-01, ... |
| Lane | Actor / role |
| Type | task / subprocess / service / user / manual / send / receive |
| Description | Verb-object ("Validate application", "Send confirmation email") |
| Inputs | Data consumed |
| Outputs | Data produced |
| SLA / duration (optional) | Expected time |
| Exceptions | Known failure modes |
Phase 4 — Per-gateway spec
For each decision point:
| Field | Description |
|---|---|
| ID | G-01, ... |
| Type | exclusive / parallel / inclusive / event-based |
| Condition | Formal rule(s) driving selection |
| Branches | Outgoing flows with labels |
| Data source | Where the decision value comes from |
Phase 5 — Exception handling
Per exception path:
| Exception | Trigger | Handler | Compensation |
|---|---|---|---|
| Application invalid | Validation fails | Return-to-applicant path | Notify applicant |
| System timeout | 30s elapsed | Escalate to manager | Log + retry policy |
Exceptions typically become alternative branches or error-boundary events on activities.
Phase 6 — Gap analysis (gap mode only)
If mode = gap, compare as-is to to-be:
| Aspect | As-is | To-be | Delta |
|---|---|---|---|
| Handoffs | 7 | 3 | −4 (automation) |
| Manual touches | 12 | 5 | −7 |
| Average cycle time | 5 days | 1 day | −4 days |
| Error-recovery paths | 2 | 5 | +3 |
Per changed activity: category (removed / added / modified / automated / merged / split).
Phase 7 — Mermaid rendering
BPMN isn't natively Mermaid — use flowchart with swimlanes via subgraphs:
flowchart LR
subgraph Customer
Start(("Start"))
Submit["Submit application"]
end
subgraph Agent
Review["Review app"]
Approve["Approve"]
Reject["Reject"]
end
subgraph System
Validate{"Valid?"}
Notify["Send result"]
end
End(("End"))
Start --> Submit --> Review --> Validate
Validate -- "Yes" --> Approve --> Notify --> End
Validate -- "No" --> Reject --> NotifyFor fuller BPMN fidelity, emit BPMN 2.0 XML (optional output) that can be imported into Camunda Modeler / bpmn.io.
Phase 8 — Optional BPMN XML emission
If user requests, produce .bpmn file with proper XML. Structure:
<?xml version="1.0" encoding="UTF-8"?>
<bpmn:definitions xmlns:bpmn="http://www.omg.org/spec/BPMN/20100524/MODEL" ...>
<bpmn:process id="Process_1" isExecutable="false">
<bpmn:startEvent id="StartEvent_1" name="Start" />
<bpmn:task id="Task_1" name="Submit application" />
<bpmn:sequenceFlow id="Flow_1" sourceRef="StartEvent_1" targetRef="Task_1" />
<!-- ... -->
</bpmn:process>
</bpmn:definitions>Note: skill emits XML structure; positional / diagram info (BPMNDI) minimal — dedicated tools re-layout on import.
Phase 9 — Diagram rendering
Per diagram-rendering mixin. File names:
process-[mode].mmd/.pngprocess-[mode].bpmn(XML, optional)gap-analysis.mmd/.png(if gap mode)
Phase 10 — Report assembly and approval
# Business Process Model: [Process]
**Date**: [date]
**Mode**: [as-is / to-be / gap]
**Actors**: [list]
**Scope**: [start → end]
## Scope
[Process, mode, actors, scope, exceptions]
## Actors / Pools / Lanes
[Pool + lane diagram + actor descriptions]
## Activities
[Table: ID, lane, type, description, inputs, outputs, SLA, exceptions]
## Gateways
[Table: ID, type, condition, branches, data source]
## Flows
[Summary: sequence + message + association counts; notable message flows across pools]
## Exception Handling
[Per exception: trigger, handler, compensation]
## Diagram
[Mermaid flowchart approximating BPMN]
## Gap Analysis (gap mode only)
[Delta per aspect + per-activity category]
## BPMN XML (if requested)
[Link to .bpmn file]
## Assumptions & Limitations
[Process coverage gaps, Mermaid-vs-BPMN fidelity notes]Present for user approval. Save only after confirmation.
Generation + extraction rules
- BPMN element vocabulary used strictly
- Gateway semantics explicit
- As-is / to-be never mixed
- No fabricated activities or actors
- Happy path and exceptions separate (marked)
Failure behavior
| Situation | Behavior |
|---|---|
| No process | Interview mode (§7) |
| No actors | Ask; 1 actor = suspicious, 10+ = probably too granular |
| Gateway condition unclear | Require explicit condition before diagramming |
| As-is mixed with to-be wishes | Split into two modes |
| Happy path only but user wants exceptions | Expand scope OR produce happy-path now + exception pass next |
| mmdc failure | See diagram-rendering mixin |
| Out-of-scope ("automate the process") | "Modeling only; automation is engineering." |
Self-check
[] Process name + mode declared
[] Actors / lanes / pools specified
[] Scope (start → end) explicit
[] BPMN vocabulary used strictly
[] Activities have type, I/O, lane
[] Gateways have type + condition + branches
[] Exception handling covered (or happy-path scope declared)
[] Flows typed (sequence / message / association)
[] Gap analysis if gap mode
[] Mermaid diagram valid
[] BPMN XML emitted if requested
[] As-is and to-be not mixed
[] No fabricated activities
[] Report follows output contract

