Mode d’emploi
- Copiez la commande et examinez le paquet avant de l’installer dans votre environnement agent.
- Consultez le document original pour les outils, identifiants et environnements requis.
- Décrivez les entrées et le livrable souhaité ; comparez la sortie aux sources.
npx skills add https://github.com/nexu-io/open-design --skill pr-feedback-quality-gateAvant de commencer
- L’installation n’inclut ni abonnement au modèle, ni quota API, ni accès aux fichiers.
- Étoiles et installations reflètent l’activité, pas un test indépendant de qualité ou de sécurité.
Rendu depuis le dépôt source en conservant titres, exemples, code, tableaux, liens et images.
PR Feedback Quality Gate
Use this when a PR has review feedback, merge conflicts, pending checks, or needs a monitored follow-up after a fix.
Workflow
- Inspect PR state first: comments, reviews, mergeability, checks, branch, and
local worktree status. Keep unrelated local changes out of the PR.
- Use an isolated worktree for review fixes or conflict resolution when the
main checkout is dirty, behind remote, or being used by another agent.
- Make the smallest safe fix. Preserve the original bug invariant and any
newer upstream structure introduced by main.
- Run the narrow validation first, then the repository-required gates. For
this repo, include pnpm guard; add package typechecks/builds/tests when touched files require them.
- Before commit or push, run a read-only cross-review of the staged or proposed
diff. Forbid file edits and git write or coordination commands.
- Treat cross-review as evidence, not authority. Accept only findings grounded
in the diff, repository rules, user goal, or validation results. Downgrade or reject style preferences, broad scope expansion, and suggestions that conflict with safety or ownership boundaries; record the reason briefly.
- If accepted blockers remain, fix them, rerun validation, and repeat the
review. Commit and push only after validation passes and there are no accepted blockers.
Monitoring cadence
- Active review or failing checks: check often enough to unblock quickly.
- Clean or approved PR waiting for merge: check about every 12 hours.
- Merged PR: reduce to daily lightweight observation for CI, release, or
regression signals, and stop making code changes unless asked.
Report
Always report PR state, actions taken, cross-review verdict, accepted or rejected findings, validation run, commits pushed, skipped checks with reasons, remaining risks, and next step.



