nexu-io/open-design

pr-feedback-quality-gate

Safely track pull request feedback, resolve review comments or merge conflicts, validate fixes, and use a read-only cross-review before committing or pushing follow-up changes.

ソースを見る

使い方

  1. インストールコマンドをコピーし、自分の環境へ導入する前にソースを確認します。
  2. 必要なツール、認証情報、対応環境を原文で確認します。
  3. 入力と成果物を指定し、出力を資料と照合します。
npx skills add https://github.com/nexu-io/open-design --skill pr-feedback-quality-gate

開始前の確認

  • 導入にはモデル契約、API枠、ファイルへのアクセス許可は含まれません。
  • スター数や導入数は活動の指標であり、独立した品質・安全性試験ではありません。
リポジトリの原文

見出し、例、コード、表、リンク、参照画像を含む原文を表示しています。

PR Feedback Quality Gate

Use this when a PR has review feedback, merge conflicts, pending checks, or needs a monitored follow-up after a fix.

Workflow

  1. Inspect PR state first: comments, reviews, mergeability, checks, branch, and

local worktree status. Keep unrelated local changes out of the PR.

  1. Use an isolated worktree for review fixes or conflict resolution when the

main checkout is dirty, behind remote, or being used by another agent.

  1. Make the smallest safe fix. Preserve the original bug invariant and any

newer upstream structure introduced by main.

  1. Run the narrow validation first, then the repository-required gates. For

this repo, include pnpm guard; add package typechecks/builds/tests when touched files require them.

  1. Before commit or push, run a read-only cross-review of the staged or proposed

diff. Forbid file edits and git write or coordination commands.

  1. Treat cross-review as evidence, not authority. Accept only findings grounded

in the diff, repository rules, user goal, or validation results. Downgrade or reject style preferences, broad scope expansion, and suggestions that conflict with safety or ownership boundaries; record the reason briefly.

  1. If accepted blockers remain, fix them, rerun validation, and repeat the

review. Commit and push only after validation passes and there are no accepted blockers.

Monitoring cadence

  • Active review or failing checks: check often enough to unblock quickly.
  • Clean or approved PR waiting for merge: check about every 12 hours.
  • Merged PR: reduce to daily lightweight observation for CI, release, or

regression signals, and stop making code changes unless asked.

Report

Always report PR state, actions taken, cross-review verdict, accepted or rejected findings, validation run, commits pushed, skipped checks with reasons, remaining risks, and next step.

タスクに関連する項目

同じリポジトリから

関連する Skills

すべての Skills