tjboudreaux/cc-thinking-skills

thinking-pre-mortem

Before committing to a plan or launch, assume it already failed and reason backward through concrete causes — convert failure paths into mitigations, gates, and stop checks.

소스 보기

사용 방법

  1. 설치 명령을 복사하고 자신의 에이전트 환경에 설치하기 전에 소스 패키지를 확인하세요.
  2. 필요한 도구, 인증 정보, 지원 환경은 원본 문서에서 확인하세요.
  3. 입력과 원하는 산출물을 설명하고 출처와 결과를 대조하세요.
npx skills add https://github.com/tjboudreaux/cc-thinking-skills --skill thinking-pre-mortem

시작 전 확인

  • 설치에는 모델 구독, API 한도, 파일 접근 권한이 포함되지 않습니다.
  • 별점 수와 설치 수는 활동 지표이며 독립적인 품질·보안 검증이 아닙니다.
원본 Skill 문서

원본 저장소의 제목, 예시, 코드, 표, 링크, 이미지를 유지해 표시합니다.

Pre-Mortem Analysis

Core rule: Prospective hindsight beats "what could go wrong?" Assume the plan has already failed (past tense), generate concrete failure paths, reverse them into prevention requirements, and bind each top path to a verifiable plan change.

When to Use

  • Before kickoff, major technical commitment, high-risk sprint work, launch, or release.
  • After a plan looks solid but before execution, especially when optimism or overconfidence is likely.
  • When a decision is costly to reverse and risks are still implicit rather than enforced.

When NOT to Use

  • Work is small, local, and cheaply reversible — skip the ceremony.
  • You are mid-incident under time pressure — act now (OODA / scientific method); pre-mortem is pre-execution.
  • You would only emit generic risks ("scope creep", "requirements unclear") that do not bind to this plan.
  • Risks are already enforced by live gates (CI, canary, rollback, alerts) with no residual unlisted path.
  • A mature risk register already covers the same specific failure paths with owners and checks.

Procedure

  1. Set the failure frame in past tense: "It is [post-deadline date]. The plan failed: [rollback / data loss / no adoption / SLA breach]." Explaining a happened failure is required; predicting one is not enough.
  2. Generate failure reasons before filtering: sweep technical, process, assumptions, dependencies/external, and people. Force a second pass: "What did the plan most need to be true that was not?" Collect breadth first (aim for many distinct reasons); do not rank mid-sweep.
  3. Prioritize: group by theme; score likelihood × impact; keep the top 3–5 concrete risks (drop generics that do not bind).
  4. Failure-first reverse analysis (absorbed reverse path): for each top risk, (a) restate the failed outcome in past tense, (b) list necessary/enabling conditions that had to be true for that failure, (c) invert each condition into a verifiable prevention requirement (avoid/require rule + check), (d) bind owner, verification checkpoint, and ship/stage gate.
  5. Mitigate and update the plan: for each top risk, attach mitigation steps, spike/contingency if needed, and the reverse-analysis prevention requirements as explicit plan gates. A pre-mortem with no plan change is incomplete.
  6. Stop when top risks each have a bound mitigation or prevention gate, or when further reasons are only generic restatements — then ship the updated plan, do not keep brainstorming.

Output

  1. Failure scenario — past-tense disaster frame with date and failed outcome.
  2. Failure reasons — unfiltered list, then prioritized top 3–5 with likelihood × impact.
  3. Reverse paths — for each top risk: necessary conditions → inverted prevention requirements.
  4. Mitigations — owner, verification checkpoint, ship/stage gate per top risk.
  5. Plan deltas — concrete tasks, spikes, contingencies, and gates added to the plan.

Verification

  • Falsify/stop: if no plan-specific failure path can be stated in past tense with necessary conditions, stop — you are generating theater, not risk. If a "mitigation" has no verification checkpoint, it is not done.
  • Over-application guard: do not pre-mortem reversible chores, mid-incident firefighting, or systems that already enforce the same paths. Do not leave abstract risks as "mitigate later"; either invert them into gates or drop them as non-actionable.