Before committing to a plan or launch, assume it already failed and reason backward through concrete causes — convert failure paths into mitigations, gates, and stop checks.

查看源码

使用方法

  1. 复制安装命令,在自己的智能体环境安装前先检查源码包。
  2. 从原始文档核对所需工具、凭据和支持的宿主。
  3. 说明输入材料与期望交付物,并对照来源检查输出。
npx skills add https://github.com/tjboudreaux/cc-thinking-skills --skill thinking-pre-mortem

开始前需了解

  • 安装不包含模型订阅、API 额度或访问文件的权限。
  • 仓库星数和安装量反映活跃情况,不等于独立质量或安全测试。
仓库原始内容

按源仓库内容呈现,保留标题、案例、代码、表格、链接以及原文引用的演示图片。

Pre-Mortem Analysis

Core rule: Prospective hindsight beats "what could go wrong?" Assume the plan has already failed (past tense), generate concrete failure paths, reverse them into prevention requirements, and bind each top path to a verifiable plan change.

When to Use

  • Before kickoff, major technical commitment, high-risk sprint work, launch, or release.
  • After a plan looks solid but before execution, especially when optimism or overconfidence is likely.
  • When a decision is costly to reverse and risks are still implicit rather than enforced.

When NOT to Use

  • Work is small, local, and cheaply reversible — skip the ceremony.
  • You are mid-incident under time pressure — act now (OODA / scientific method); pre-mortem is pre-execution.
  • You would only emit generic risks ("scope creep", "requirements unclear") that do not bind to this plan.
  • Risks are already enforced by live gates (CI, canary, rollback, alerts) with no residual unlisted path.
  • A mature risk register already covers the same specific failure paths with owners and checks.

Procedure

  1. Set the failure frame in past tense: "It is [post-deadline date]. The plan failed: [rollback / data loss / no adoption / SLA breach]." Explaining a happened failure is required; predicting one is not enough.
  2. Generate failure reasons before filtering: sweep technical, process, assumptions, dependencies/external, and people. Force a second pass: "What did the plan most need to be true that was not?" Collect breadth first (aim for many distinct reasons); do not rank mid-sweep.
  3. Prioritize: group by theme; score likelihood × impact; keep the top 3–5 concrete risks (drop generics that do not bind).
  4. Failure-first reverse analysis (absorbed reverse path): for each top risk, (a) restate the failed outcome in past tense, (b) list necessary/enabling conditions that had to be true for that failure, (c) invert each condition into a verifiable prevention requirement (avoid/require rule + check), (d) bind owner, verification checkpoint, and ship/stage gate.
  5. Mitigate and update the plan: for each top risk, attach mitigation steps, spike/contingency if needed, and the reverse-analysis prevention requirements as explicit plan gates. A pre-mortem with no plan change is incomplete.
  6. Stop when top risks each have a bound mitigation or prevention gate, or when further reasons are only generic restatements — then ship the updated plan, do not keep brainstorming.

Output

  1. Failure scenario — past-tense disaster frame with date and failed outcome.
  2. Failure reasons — unfiltered list, then prioritized top 3–5 with likelihood × impact.
  3. Reverse paths — for each top risk: necessary conditions → inverted prevention requirements.
  4. Mitigations — owner, verification checkpoint, ship/stage gate per top risk.
  5. Plan deltas — concrete tasks, spikes, contingencies, and gates added to the plan.

Verification

  • Falsify/stop: if no plan-specific failure path can be stated in past tense with necessary conditions, stop — you are generating theater, not risk. If a "mitigation" has no verification checkpoint, it is not done.
  • Over-application guard: do not pre-mortem reversible chores, mid-incident firefighting, or systems that already enforce the same paths. Do not leave abstract risks as "mitigate later"; either invert them into gates or drop them as non-actionable.